The main intention of the project is the improvement of site usage with commercials; because the location is predicted to be very central after regional development. The ground floor is planned to surround the street with commercial units by this way project welcomes not only dwellers but also visitors. The internal area of this mass is planned for landscape and open gathering areas for dwellers. In addition to that this area has a direct connection with the recreational facility. The tower entrance is also placed at that façade for security purposes. Mass movement is stepped for creating green terraces for common use; in that way landscape and greenery is continued at upper floors. The main aim of that design is provided enough green area for population. That aim is continued at façade design. In addition, that functional intention we try to create a flow or visual movement at face for aesthetic coherence. All floor’s terraces have a small rotation for façade movement continuation.

2018

2018

Total Construction Area: 29.000 m²
Total Site Area: 4199 m²

Project Team: Evren Yiğit Architects
Employer: Bektaş Construction
İnterior Design / Landscape Design: Evren Yiğit Architects
3d Modelling: Evren Yiğit Architects

/