Location: Futian Distrcit, Shenzhen, Guangdong China + The planned steel bridge arches over the tributary in a single span of 125m in width. The arched footbridge narrows from apex to bearings in relation to the load, creating a shallow shape. To minimise visual impact on the surroundings and to allow for smaller boat traffic the abutments are integrated into the inclined bank allowing the tributary to flow through undisturbed. A system of electropolished structural steel tubes provides a sleek and transparent feature to the site.
2010
2010