We were approached by the lead consultant to join them as part of a team to produce landscape related information as part of a bid for the first phase of this mixed use development in east London.
Our proposals needed to address the requirements of the various spaces including public, semi-public, and semi-private realm. Part of the brief, being the first of a number of phases of this development, was to appropriately connect the main access route (running north south through the development) to the existing pedestrian thoroughfare to the south. Careful manipulation of levels was necessary to ensure all areas were accessible to all as the existing carriageway to the south is two metres higher than the FFL of the adjacent proposed buildings. The retention of a significant line of existing trees in this location was also essential.
The proposals for the main carriageways through this part of the site adopted the principals of shared surfaces with similar paring material proposed for both ‘carriageway’ and ‘footway’. A public square is proposed at their intersection with the intention of occasional community events and markets.
2010