The project lies on an approximately 120000m² site neighboring the Sakarya River. The design focuseson encouraging use of green space and enhancing the public outdoor uses within the social housing site. The density of the program is dissolved into multiple perimeter blocks that connect to the city via an outer ring road, and leave the central axis for pedestrian uses. A green belt that connects the city center to the Sakarya River extends along the central axis of the project and forms a backbone for social uses. The green belt organizes the pedestrian movements within the site, as well as housing small-scale commercial functions serving the vicinity, and concludes with a social center at the end facing the river side.
Each housing block features a semi-private courtyard reserved for social functions and playgrounds. The courtyards can be approached from the central axis and from the blocks.
The project offers an greener and more social alternative for living compared to the conventional housing schemes in its vicinity.
2015
Project Partner: BNR Proje Planlama ve Kentsel Dönüşüm
Construction Area: 215472.4m²
Landscape Area: 74495.33m²
Client: Sakarya Erenler Municipality
Structural Engineering: Ozun Project
Mechanical Engineering: Beseli Engineering
Electrical Engineering: EKC Engineering
Infrastructure Engineering: DIYAP Project
Landscape Design: Motto Architecture, Leman Elverisli
Onur Ozkoc, Heves Beseli, Hakan Sanli, Mehmet Karadag, Yucel Sala, Irem Buyukkocak, Binnur Arslan